Check Box for These Contents In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346, ext #20 (Mon. to Fri
STEP O NE2Lay out the two carrying beams as illustrated with pre-drilled holes facing up. Position the five rafters over the respective predrilled
ST EP T W O3The Faireld ArborST EP TH RE ESet out one post and complete the side panel by insertingthe side panel assembly into the holes on the po
ST EP F IV EMove side panels to their final location and adjust the openingwidth to 50 in. (127 cm.). Place the pre-assembled arbor top onto the post
LevelMove the arbor to its final location (you will need a helper).When you have identified the location of each post, mark the positions of the groun